Contracts
Contracts, warranties and lien waivers
Three documents that decide what happens when the job goes wrong, and why the last payment should wait for the third.
By RoofElm Editorial Team Updated 7 min read
- Lien law is set by
- Each state
- Hold back
- Final payment
- Get at final payment
- Lien waiver in writing
- Right to cancel
- 3 days, some home sales
In short
A contract fixes the scope, the price and the payment schedule. A warranty says who fixes what, for how long. A lien waiver says the people who worked on your house have been paid. Lien law is state law: in many states a subcontractor or supplier who goes unpaid can file a claim against your property even after you paid your contractor, and the deadlines, notices and forms differ. Pay in stages, collect waivers with each payment, and keep every paper. Your state's rules are linked from the state help pages and from your attorney general or licensing board.
What a home improvement contract should say
A contract turns a bid into a promise. Many states require a written contract for home improvement work, some only above a set dollar amount, and some prescribe the wording and notices it must carry. Those rules differ by state, so ask your attorney general's consumer office or your state licensing board what yours require. The points below are good practice in any state.
- Names and license: the legal business name, address, phone and license number, matching what the state board shows. See how to hire a licensed contractor.
- Scope and materials: the work in steps, with named products and quantities, as described in the estimate reading guide.
- Price and payment schedule: the total, the deposit, and payments tied to finished stages.
- Start and finish dates: and what happens if weather or materials delay the job.
- Permits: who applies, who pays, who is present at inspections. See permits and inspections.
- Change orders: no extra work or extra charge without a signed change order.
- Cancellation: how and by when you can cancel, in plain words.
- Warranty: written terms attached, not promised aloud.
Do not sign a contract with blank lines. Do not accept a verbal promise that is missing from the paper. If a salesperson says "we will take care of that," ask them to write it in.
The right to cancel
The Federal Trade Commission's Cooling-Off Rule gives you a three-day right to cancel many sales made at your home. The rule has exceptions, including limits on which sales and which situations it covers, so read the FTC page before you rely on it. Some states add their own cancellation rights for home improvement sales, with their own notices and time limits. If the contract does not tell you how to cancel, ask the contractor to add it, and call your attorney general's consumer office if you get no straight answer.
Warranties: who fixes what, and for how long
A job usually has two warranties, and people mix them up. The manufacturer's warranty covers the product: the shingles, the windows, the siding. The workmanship warranty comes from the contractor and covers the installation. A leak caused by a bad flashing job is usually a workmanship problem. A shingle that fails on its own is usually a manufacturer problem.
| Question | Manufacturer warranty | Workmanship warranty |
|---|---|---|
| Who gives it | The product maker | The contractor |
| What it covers | Defects in the product | Errors in the installation |
| Ask for | The written terms and registration steps | Length in years and a contact |
| Watch for | Conditions on how it was installed | A company that may not exist in five years |
Read the terms for conditions. Some product warranties require installation by a certified installer, specific ventilation or registration within a set time. Ask the contractor which steps are needed and who completes them. Keep the paperwork where you can find it, and see how to keep records of home improvements.
Liens: the risk behind an unpaid subcontractor
A mechanic's lien, sometimes called a construction lien, is a legal claim against a property by someone who worked on it or supplied materials and was not paid. Lien law is state law. Who can file, what notice they must give, how long they have and how the claim is removed all vary. In many states a lien can be filed even when you paid your general contractor in full, if that contractor failed to pay the subcontractor or supplier. A lien can cloud your title and complicate a sale or a refinance.
State agencies explain their own rules. The Contractors State License Board in California and the Minnesota Attorney General both publish homeowner guides on liens, and they are good examples of how detailed the rules get. Look for the equivalent from your state's licensing board, attorney general or bar association, and do not rely on a rule you read about another state.
Ask the contractor, before signing, which subcontractors and suppliers will be on the job. Ask the contractor to confirm in writing that they are paid. Your state may give you a way to confirm too, such as a notice from a subcontractor, which you should not ignore.
Lien waivers and how to use them
A lien waiver is a signed statement from a contractor, subcontractor or supplier that they have been paid and give up the right to file a lien for that amount. Forms vary by state, and some states prescribe the exact form. Many forms come in two types: a conditional waiver takes effect when payment clears, and an unconditional waiver takes effect when signed. Your state's rules decide which forms are valid.
- Ask the contractor what waivers they provide and which states' forms they use.
- With each payment, ask for a waiver from the contractor, and from subcontractors and suppliers where the job has them.
- Prefer a conditional waiver when you hand over a check, and an unconditional one after the payment clears.
- At the final payment, ask for a final waiver from the contractor and any major subcontractor.
- Keep every waiver with the contract, and keep the proof of payment.
If the contractor refuses to provide waivers, that is a signal. Ask your attorney general's consumer office or a local attorney what to do before you pay.
Hold the last payment and keep the paper
Tie the final payment to completion: the work matches the contract, the cleanup is done, the permit is closed out and you hold the waivers. A roof replacement is a good example, since the inspection and the nail sweep come at the end. Pay by a method that leaves a record, and keep it with the contract, the change orders, the warranty and the waivers.
If a dispute comes up, write to the contractor, keep a copy and set a date for a reply. Then contact the state licensing board where one exists, and your attorney general's consumer office. A lawyer can advise on liens and claims in your state. RoofElm is not a law firm, and nothing here is legal advice.
Common questions
Can a lien be filed on my house if I paid the contractor?
In many states, yes: a subcontractor or supplier who was not paid by the contractor may be able to file one. The rules, notices and deadlines vary by state, so check with your attorney general, licensing board or a local attorney.
What is a lien waiver?
A signed statement that a contractor, subcontractor or supplier has been paid and gives up the right to file a lien for that amount. Some states prescribe the form.
What is the difference between a manufacturer warranty and a workmanship warranty?
The manufacturer warranty covers defects in the product. The workmanship warranty comes from the contractor and covers installation errors. Get both in writing.
Can I cancel a contract I signed at my home?
The FTC's Cooling-Off Rule gives a three-day right to cancel many sales made at your home, with exceptions, and some states add their own rights. Read the FTC page and ask your attorney general's consumer office.
Sources
- FTC Consumer Advice: Buyer's Remorse, the FTC's Cooling-Off Rule May Help
- FTC: Cooling-off Period for Sales Made at Home or Other Locations
- California Contractors State License Board: Understanding Mechanics Liens
- California Contractors State License Board: Homeowner's Guide to Preventing Mechanics Liens
- Minnesota Attorney General: Home Building and Remodeling handbook
Source links were checked on November 19, 2026 for title and address only; this guide states no deadlines, dollar limits or form wording. Lien, licensing and cancellation rules are state law and change: confirm them with your state's licensing board, attorney general or a local attorney.
Next on the job
-
Guide
Read a contractor estimate
Scope, named materials, allowances and exclusions: what every home improvement bid should say.
-
Guide
Keep records of home improvements
Contracts, receipts, permits, warranties and photos to save, and how they help with claims, sales and taxes.
-
Guide
Permits and inspections
When a job needs a permit, who pulls it, what inspectors check and what skipping one can cost.