Permits and inspections: who pulls them and why they matter
Your city or county decides what needs a permit. Here is how to ask, what to put in the contract and how to close the file.
By RoofElm Editorial Team Updated 6 min read
- Who decides
- Local building office
- Model roofing code
- IRC R908
- Who pulls the permit
- Say so in the contract
- Proof it is done
- Final inspection sign-off
In short
A building permit is permission from your local building office to do work that the code covers, and an inspection is the office checking that the work meets the code. Local government decides what needs a permit, so the answer for a roof, window or fence in your town can differ from the next town over. Ask the office before you sign, write in the contract who applies and who pays, and keep the final sign-off. Skipping the permit tends to show up later, when you sell or file an insurance claim.
What a permit is, and who decides
Building codes are model rules, such as the International Residential Code, that states and cities adopt, often with local changes and on different schedules. The building office of your city or county applies the version in force where you live. Some states set a statewide code, and others leave adoption to local governments. That is why a roofing rule you read about in another state may not apply to you.
A permit is the office's approval to start. An inspection is the office's check, at set stages, that the work matches the code and the approved plan. The permit fee pays for the review and the inspections. Ask the office what it charges and how it is calculated, because fees are set locally.
Which jobs usually need one
The usual pattern is that work touching structure, electrical, plumbing, gas or the building envelope is more likely to need a permit than cosmetic work. Even within one category, cities differ. Ask about your exact job rather than guessing.
| Job | Ask the office | See |
|---|---|---|
| Roof replacement | Is a permit needed, and does tear-off to the deck apply? | Roof replacement |
| Window replacement | Does a same-size swap need a permit? What about energy rules? | Window replacement |
| Siding replacement | Is a permit needed, and are inspections done on the wall behind? | Siding replacement |
| Fence | Is there a height limit, a setback or a permit? | Fence repair and replacement |
The code itself can shape a bid. The model roofing code, section R908.3 of the International Residential Code, says a replacement removes existing layers down to the deck, and a recover is not permitted over two or more layers. Cities adopt their own versions, so confirm the local rule with the building office before you accept a bid that proposes to roof over the old shingles.
Who pulls the permit
In most cases the contractor applies for and pays for the permit, and the cost appears in the bid or the contract. Where states license contractors, the permit is usually tied to the license. Where they do not, as in Texas, the city's permit rule is the main check, so see the Texas page for an example and the state help hub for your own state.
Be careful when a contractor asks you to pull the permit in your own name. Some jurisdictions let an owner pull a permit for work on their own home, but then you are the responsible party, and the contractor's license or insurance may no longer sit between you and a problem. Ask the building office what an owner's permit means before you agree. A contractor who says that no permit is needed, when the office says otherwise, has told you something important about how they work.
- Contract line: "Contractor will obtain all required permits and schedule all required inspections."
- Contract line: the permit number, once issued, on the final invoice.
- Contract line: the final payment is due after the final inspection passes, where the job requires one.
What inspections check
Inspections happen at stages, and the stages depend on the job. A new roof might get one when the old roof is stripped and the deck is exposed, and another when the roof is complete. A wall or a deck might be inspected before it is closed in, because the inspector cannot see through drywall. The permit card lists the stages that apply.
- Ask the contractor at the start which inspections the permit requires, and who schedules each one.
- Make sure the work does not get covered before the inspector has looked, where the office requires an inspection at that stage.
- Be there, or have a contractor representative there, so questions can be answered and corrections noted.
- If the work fails, ask for the correction list in writing and a date for the re-inspection.
- Ask for the final sign-off. It may be called a final approval, a certificate or a closed permit, depending on where you live.
An inspection is a code check, not a guarantee of workmanship. It does not replace your own look at the work or the contract's workmanship warranty. Read contracts, warranties and lien waivers for how those fit together.
What an unpermitted job can cost you
Skipping the permit may save time now, and the risks tend to arrive later. None of these is certain in every place, which is why you ask the local office instead of assuming.
Insurance
An insurer may ask about unpermitted work when you file a claim. Ask your insurer how it treats it.
Selling
Buyers, inspectors and lenders may ask for permit records. Unpermitted work can slow or reopen a sale.
Fines and corrections
Some offices fine unpermitted work or require it to be opened up so the inspector can see it. Fees and penalties are set locally.
Safety
Inspections exist to catch hidden problems such as wiring, framing or flashing that fails years later.
If you already have unpermitted work, from a previous owner or a past job, call the building office and ask how to bring it into compliance. Offices often have a process and would rather hear from you than find out in a sale.
Close the file
When the job is finished, keep the permit, the inspection records, the final sign-off, the contract, the receipts and the warranty together. They are your proof that the work was done to code, and they help at resale, in an insurance claim and in a dispute. Keeping records of home improvements shows a simple system. If you are still choosing a contractor, how to hire a licensed contractor lists what to check first.
Common questions
Do I need a permit to replace my roof?
Often, but it depends on your city or county. Ask the building office for your address, and write in the contract who applies and pays.
Can I pull a permit myself instead of the contractor?
Some places allow it for work on your own home, but you then take responsibility for the work meeting code. Ask the building office what an owner's permit means before agreeing.
Who sets the building code?
Model codes such as the International Residential Code are adopted by states and cities, often with local changes. Your local building office applies the version in force where you live.
What if my contractor says no permit is needed?
Ask the building office yourself. If the office says one is required, take that as a reason to ask hard questions about the contractor before you sign.
Sources
- City of Firestone, Colorado: Re-roof requirements under the International Residential Code
- FTC Consumer Advice: How To Avoid a Home Improvement Scam
- Minnesota Attorney General: Home Building and Remodeling handbook
Source links were checked on November 19, 2026 for title and address only; the one code citation, IRC section R908.3, is the roofing rule used on the roof replacement page. Building codes are adopted city by city and change on a cycle: confirm your local rule with the building office.
Next on the job
-
Project
Roof replacement
Tear-off, squares, ventilation and the questions to ask before you sign a bid.
-
Guide
Hire a licensed contractor
Check the license, the insurance and the permit plan before you sign. Licensing is state law.
-
Guide
Keep records of home improvements
Contracts, receipts, permits, warranties and photos to save, and how they help with claims, sales and taxes.